My mom used to say guys like us find each other, lol.
The boys got 3 of the exterior walls sheeted, ran the 2x4s, and my 2x10 walkway up in the trusses, and a few more minor things. With that stuff done, I was able to start wiring some of the things that are going to be buried when they put the attic insulation & ceiling sheeting up early next week. The plan is to put wiring for 3 ceiling fans, 10 switched outlets for lights, some attic lights, and wiring for heat sensors for the attic (194 degree) & ceiling mount sensors (135 degree) to tie into the alarm system. That all needs to be done by tomorrow. Luckily, they're letting me use the JLG vertical lift, which is a huge time saver, not to mention much safer.